For a residential complex of 50 villas in Nongo (Conakry), MATELEC is deploying a modern, reliable electrical infrastructure.
The works
- A 1,000 kVA transformer substation, for a stable power supply across the whole site
- Underground electrical servicing: buried cables pulled in place of the traditional overhead network
- ERMBT cabinets (low-voltage distribution and metering equipment), for safe, individual low-voltage distribution to each villa