Communication Electrical cables and conduits for Orange Guinea’s new headquarters in Koloma MATELEC delivered electrical cables and conduits to the construction site of Orange Guinea’s new headquarters in Koloma (Conakry), a flagship project currently under way. Equipment supplied Electrical... 11 Oct 2026
Communication EDG equips itself with Gridwatch monitoring units with MATELEC MATELEC handled the deployment and technical management of the installation of Gridwatch units, designed by Chauvin Arnoux Energy, in the substations of Électricité de Guinée (EDG). What the solution ... 11 Oct 2026
Communication 50-villa complex in Nongo: 1,000 kVA substation and underground power network For a residential complex of 50 villas in Nongo (Conakry), MATELEC is deploying a modern, reliable electrical infrastructure. The works A 1,000 kVA transformer substation, for a stable power supply ac... 11 Oct 2026
Communication Delivery and installation of a 65 kVA generator for AFG Bank MATELEC delivered and installed a 65 kVA generator for AFG Bank (formerly Société Générale de Guinée), to guarantee a reliable, high-performance power supply. What we did Delivery of the 65 kVA genera... 11 Oct 2026
Communication DeepHub 75’’ and 86’’ interactive displays delivered to EDG departments MATELEC delivered 75-inch and 86-inch DeepHub smart interactive displays to the various departments of Électricité de Guinée (EDG). Equipment supplied DeepHub 75’’ smart interactive displays DeepHub 8... 11 Oct 2026